Project Description
During the modernisation of the railway line from Nové Mesto nad Váhom to Zilina, 150,000 tonnes of railway ballast were needed.
Modernisation means that the route can be traversed at a speed of 160km/h.
During the modernisation of the railway line from Nové Mesto nad Váhom to Zilina, 150,000 tonnes of railway ballast were needed.
Modernisation means that the route can be traversed at a speed of 160km/h.